MANI Hanaoka Factory No.1 Factory
| Construction Period | October 2023 - January 2025 |
|---|---|
| Structure / Floors | Steel 1F |
| Total Floor Area | 16,294 sq.m. |
| Location | Tochigi, Japan |
| Construction Period | October 2023 - January 2025 |
|---|---|
| Structure / Floors | Steel 1F |
| Total Floor Area | 16,294 sq.m. |
| Location | Tochigi, Japan |