Stanley Electric Hiroshima Factory
| Construction Period | April 2022 - December 2024 |
|---|---|
| Structure / Floors | Steel 2F |
| Total Floor Area | 14,871 sq.m. |
| Location | Hiroshima, Japan |
| Construction Period | April 2022 - December 2024 |
|---|---|
| Structure / Floors | Steel 2F |
| Total Floor Area | 14,871 sq.m. |
| Location | Hiroshima, Japan |