Yoshindo Pharmaceutical Third Plant
| Construction Period | June 2023 - September 2024 |
|---|---|
| Structure / Floors | Steel 4F |
| Total Floor Area | 12,610 sq.m. |
| Location | Toyama, Japan |
| Construction Period | June 2023 - September 2024 |
|---|---|
| Structure / Floors | Steel 4F |
| Total Floor Area | 12,610 sq.m. |
| Location | Toyama, Japan |