Toyo Gosei Chiba Factory No.4 Photosensitive Material Factory Phase 2
| Construction Period | March 2023 - August 2024 | |
|---|---|---|
| Structure / Floors | Steel 6F | |
| Total Floor Area | 2,606 sq.m. | |
| Location | Chiba, Japan | " |
| Construction Period | March 2023 - August 2024 | |
|---|---|---|
| Structure / Floors | Steel 6F | |
| Total Floor Area | 2,606 sq.m. | |
| Location | Chiba, Japan | " |