Yamasa Shiga Ryuoh Factory (Yamasa ORM Shiga Ryuoh)
| Construction Period | May 2022 - June 2023 |
|---|---|
| Structure / Floors | Steel 3F |
| Total Floor Area | 6,850 sq.m. |
| Location | Shiga, Japan |
| Construction Period | May 2022 - June 2023 |
|---|---|
| Structure / Floors | Steel 3F |
| Total Floor Area | 6,850 sq.m. |
| Location | Shiga, Japan |