Showa Sangyo S2 Hosaka Plant


Construction Period | September 2021 - October 2022 |
---|---|
Structure / Floors | Steel, 2F |
Total Floor Area | 3,416 sq.m. |
Location | Yamanashi,Japan |
Construction Period | September 2021 - October 2022 |
---|---|
Structure / Floors | Steel, 2F |
Total Floor Area | 3,416 sq.m. |
Location | Yamanashi,Japan |