Gourmet Kitchen
| Construction Period | March 2021 - January 2022 |
|---|---|
| Structure / Floors | Steel, 2F |
| Total Floor Area | 2,068 sq.m. |
| Location | Aichi,Japan |
| Construction Period | March 2021 - January 2022 |
|---|---|
| Structure / Floors | Steel, 2F |
| Total Floor Area | 2,068 sq.m. |
| Location | Aichi,Japan |