Konica Minolta Mechatronics Head Office
| Construction Period | March 2020 - March 2021 |
|---|---|
| Structure / Floors | Steel, 3F |
| Total Floor Area | 20,842 sq.m. |
| Location | Aichi, Japan |
| Construction Period | March 2020 - March 2021 |
|---|---|
| Structure / Floors | Steel, 3F |
| Total Floor Area | 20,842 sq.m. |
| Location | Aichi, Japan |