Rock Field Shizuoka Factory
Construction Period | March 2019 - September 2020 |
---|---|
Structure / Floors | Steel, 3F |
Total Floor Area | 8,215 sq.m. |
Location | Shizuoka,Japan |
Construction Period | March 2019 - September 2020 |
---|---|
Structure / Floors | Steel, 3F |
Total Floor Area | 8,215 sq.m. |
Location | Shizuoka,Japan |