Toyota Bosyoku Monozukuri Innovation Center
| Construction Period | December 2018 - January 2020 |
|---|---|
| Structure / Floors | Reinforced Concrete,Steel 5F |
| Total Floor Area | 36,559 sq.m. |
| Location | Aichi, Japan |
| Construction Period | December 2018 - January 2020 |
|---|---|
| Structure / Floors | Reinforced Concrete,Steel 5F |
| Total Floor Area | 36,559 sq.m. |
| Location | Aichi, Japan |