Hirata Seiki No.3 Factory


Construction Period | September 2017 - April 2018 |
---|---|
Structure / Floors | Steel, 2F |
Total Floor Area | 7,879 sq.m. |
Location | Simane, Japan |
Construction Period | September 2017 - April 2018 |
---|---|
Structure / Floors | Steel, 2F |
Total Floor Area | 7,879 sq.m. |
Location | Simane, Japan |