Fuji Electric Co., Ltd. Powerele Technical Center
| Construction Period | October 2015 - July 2016 |
|---|---|
| Structure / Floors | Steel, 4F-PH1 |
| Total Floor Area | 20,767 sq.m. |
| Location | Mie, Japan |
| Construction Period | October 2015 - July 2016 |
|---|---|
| Structure / Floors | Steel, 4F-PH1 |
| Total Floor Area | 20,767 sq.m. |
| Location | Mie, Japan |