Meguro Incineration Plant
| Construction Period | June 2017 - March 2023 |
|---|---|
| Structure / Floors | Steel Reinforced Concrete,Reinforced Concrete,Steel, B3-5F-PH1 |
| Total Floor Area | 35,699 sq.m. |
| Location | Tokyo,Japan |
| Construction Period | June 2017 - March 2023 |
|---|---|
| Structure / Floors | Steel Reinforced Concrete,Reinforced Concrete,Steel, B3-5F-PH1 |
| Total Floor Area | 35,699 sq.m. |
| Location | Tokyo,Japan |