Ofunato Biomass Power Plant
| Construction Period | September 2017 - July 2019 |
|---|---|
| Structure / Floors | Reinforced Concrete, 4F |
| Total Floor Area | 5,082 sq.m. |
| Location | Iwate, Japan |
| Construction Period | September 2017 - July 2019 |
|---|---|
| Structure / Floors | Reinforced Concrete, 4F |
| Total Floor Area | 5,082 sq.m. |
| Location | Iwate, Japan |