Himi Arts Hall
| Construction Period | September 2020 - July 2022 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel 4F |
| Total Floor Area | 10,535 sq.m. |
| Location | Toyama, Japan |
| Construction Period | September 2020 - July 2022 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel 4F |
| Total Floor Area | 10,535 sq.m. |
| Location | Toyama, Japan |