Juntendo University Urayasu Hinode Campus
| Construction Period | March 2019 - December 2021 |
|---|---|
| Structure / Floors | Reinforced Concrete,Steel, 5F |
| Total Floor Area | 15,992 sq.m. |
| Location | Chiba,Japan |
| Construction Period | March 2019 - December 2021 |
|---|---|
| Structure / Floors | Reinforced Concrete,Steel, 5F |
| Total Floor Area | 15,992 sq.m. |
| Location | Chiba,Japan |