On-site Day-care Center in CKD Corporation
| Construction Period | August 2017 - March 2018 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel, Wooden, 1F |
| Total Floor Area | 405 sq.m. |
| Location | Aichi, Japan |
| Construction Period | August 2017 - March 2018 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel, Wooden, 1F |
| Total Floor Area | 405 sq.m. |
| Location | Aichi, Japan |