Toyama Prefectural Museum of Art and Design










Construction Period | May 2015 - December 2016 |
---|---|
Structure / Floors | Reinforced Concrete, Steel Reinforced Concrete, Steel, 4F-PH1 |
Total Floor Area | 14,975 sq.m. |
Location | Toyama, Japan |
Construction Period | May 2015 - December 2016 |
---|---|
Structure / Floors | Reinforced Concrete, Steel Reinforced Concrete, Steel, 4F-PH1 |
Total Floor Area | 14,975 sq.m. |
Location | Toyama, Japan |