Miho Institute of Aesthetics
| Completion | March 2012 |
|---|---|
| Structure / Floors | Reinforced Concrete (Steel Reinforced Concrete, Steel), B1-4F-PH1 |
| Total Floor Area | 24,809 sq.m. |
| Location | Shiga, Japan |
| Completion | March 2012 |
|---|---|
| Structure / Floors | Reinforced Concrete (Steel Reinforced Concrete, Steel), B1-4F-PH1 |
| Total Floor Area | 24,809 sq.m. |
| Location | Shiga, Japan |