Six Senses Kyoto
| Construction Period | October 2021 - March 2024 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel B2-4F |
| Total Floor Area | 11,804 sq.m. |
| Location | Kyoto, Japan |
| Construction Period | October 2021 - March 2024 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel B2-4F |
| Total Floor Area | 11,804 sq.m. |
| Location | Kyoto, Japan |