MYNS CHIBA
| Construction Period | November 2016 - October 2022 |
|---|---|
| Structure / Floors | Steel, Reinforced Concrete, Steel Reinforced Concrete B1-10F-PH1 |
| Total Floor Area | 24,935 sq.m. |
| Location | Chiba, Japan |
| Construction Period | November 2016 - October 2022 |
|---|---|
| Structure / Floors | Steel, Reinforced Concrete, Steel Reinforced Concrete B1-10F-PH1 |
| Total Floor Area | 24,935 sq.m. |
| Location | Chiba, Japan |