HOTEL THE MITSUI KYOTO
Construction Period | March 2018 - July 2020 |
---|---|
Structure / Floors | Steel, Reinforced Concrete,Wooden B1-4F |
Total Floor Area | 19,026 sq.m. |
Location | Kyoto,Japan |
Construction Period | March 2018 - July 2020 |
---|---|
Structure / Floors | Steel, Reinforced Concrete,Wooden B1-4F |
Total Floor Area | 19,026 sq.m. |
Location | Kyoto,Japan |