Ginza Marronnier Terrace
| Construction Period | January 2019 - January 2020 |
|---|---|
| Structure / Floors | Steel, 9F |
| Total Floor Area | 1,491 sq.m. |
| Location | Tokyo, Japan |
| Construction Period | January 2019 - January 2020 |
|---|---|
| Structure / Floors | Steel, 9F |
| Total Floor Area | 1,491 sq.m. |
| Location | Tokyo, Japan |