HOTEL CLAD Konohananoyu
| Construction Period | April 2017 - October 2019 |
|---|---|
| Structure / Floors | Steel Reinforced Concrete, Reinforced Concrete,Steel, 8F-PH1 |
| Total Floor Area | 12,035 sq.m. |
| Location | Shizuoka, Japan |
| Construction Period | April 2017 - October 2019 |
|---|---|
| Structure / Floors | Steel Reinforced Concrete, Reinforced Concrete,Steel, 8F-PH1 |
| Total Floor Area | 12,035 sq.m. |
| Location | Shizuoka, Japan |