SAGA MAZDA Takeo Sales Office
| Construction Period | September 2017 - March 2018 |
|---|---|
| Structure / Floors | Steel, 1F |
| Total Floor Area | 860 sq.m. |
| Location | Saga, Japan |
| Construction Period | September 2017 - March 2018 |
|---|---|
| Structure / Floors | Steel, 1F |
| Total Floor Area | 860 sq.m. |
| Location | Saga, Japan |