TOKYU PLAZA GINZA
| Construction Period | September 2013 - February 2016 |
|---|---|
| Structure / Floors | Steel Reinforced Concrete, Reinforced Concrete, Steel, B5-11F-PH2 |
| Total Floor Area | 50,000 sq.m. |
| Location | Tokyo, Japan |
| Construction Period | September 2013 - February 2016 |
|---|---|
| Structure / Floors | Steel Reinforced Concrete, Reinforced Concrete, Steel, B5-11F-PH2 |
| Total Floor Area | 50,000 sq.m. |
| Location | Tokyo, Japan |