JAKARTA MORI TOWER
| Construction Period | July 2017 - October 2022 |
|---|---|
| Structure / Floors | Steel Reinforced Concrete, Steel, Reinforced Concrete B4-58F |
| Total Floor Area | 184,230 sq.m. |
| Location | Indonesia |
| Construction Period | July 2017 - October 2022 |
|---|---|
| Structure / Floors | Steel Reinforced Concrete, Steel, Reinforced Concrete B4-58F |
| Total Floor Area | 184,230 sq.m. |
| Location | Indonesia |