PT. Mulia Boga Raya New Factory
| Construction Period | May 2025 - April 2026 |
|---|---|
| Structure / Floors | Steel, Reinforced Concrete 2F |
| Total Floor Area | 19,444 sq.m. |
| Location | Indonesia |
| Construction Period | May 2025 - April 2026 |
|---|---|
| Structure / Floors | Steel, Reinforced Concrete 2F |
| Total Floor Area | 19,444 sq.m. |
| Location | Indonesia |