SANPO RUBBER INDONESIA New Factory
| Construction Period | May 2021 - January 2022 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel, B1-2F |
| Total Floor Area | 3,165 sq.m. |
| Location | Indonesia |
| Construction Period | May 2021 - January 2022 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel, B1-2F |
| Total Floor Area | 3,165 sq.m. |
| Location | Indonesia |