Kadoorie Farm Center
| Construction Period | October 2022 - December 2024 |
|---|---|
| Structure / Floors | Reinforced Concrete 5F |
| Total Floor Area | 8,000 sq.m. |
| Location | Hong Kong |
| Construction Period | October 2022 - December 2024 |
|---|---|
| Structure / Floors | Reinforced Concrete 5F |
| Total Floor Area | 8,000 sq.m. |
| Location | Hong Kong |