Kowa Pharmaceuticals (China) Co.,Ltd. Changzhou Plant
| Construction Period | April 2016 - July 2017 |
|---|---|
| Structure / Floors | Reinforced Concrete, Steel, 4F-PH1 |
| Total Floor Area | 27,681 sq.m. |
| Location | China |