The Chugoku Electric Power Co., Inc. Takeyamachi Building (Hiroshima Central Substation)

  • Civil engineering
  • Energy and storage
  • Hiroshima
  • 2002
CompletionJanuary 1970
Structure / Floors【Above ground】
Steel (CFT columns) + RCST 9F-PH1
【Below ground】
Reinforced Concrete (CFT columns)
Retaining walls: In-situ diaphram wall(SSS-B), B4-B1F, maximum depth of 28.4m
Total Floor AreaAbove ground: 13,176 sq.m., Below ground: 7,399 sq.m.
LocationHiroshima, Japan