- 1944
- Research Section organized in the design department of the head office
- 1949
-
Renamed as the Research Department
Laboratory in the back of the head office (1955) - 1960
-
Renamed as the Research Laboratory
Basement laboratory of the head office (1960) - 1962
- Inaugural issues of Reports from the Research Laboratory of Shimizu Construction Co.,Ltd. and Special Report from the Research Laboratory of Shimizu Construction Co.,Ltd. published
- 1972
-
Main building built in Etchujima, Koto-ku, to integrate all functions
Aerial view of Institute of Technology (1974) - 1975
- Structural Testing Laboratory and Acoustic Laboratory opened
- 1984
- Renamed as the Institute of Technology
Clean Room Laboratory opened - 1986
- Vibration Testing Laboratory opened
- 1988
- Ultra-Clean Room Laboratory opened
- 1991
-
Geotechnical Centrifuge Laboratory, Vibration Control Laboratory opened
Aerial view of Institute of Technology (1994) - 1998
- Electromagnetic Environment Laboratory opened
- 2001
- Rooftop Biotope opened
Acoustics Laboratory expanded - 2003
- New Main Building opened
- 2005
- Historical Gallery of Construction Technology opened
New Wind Tunnel Testing Laboratory opened - 2006
- New Biotope "Saisei-no Mori" opened
Rock Testing Block, Environment Testing Block, and Fire Testing Block opened
Microgrid demonstration facility opened
Safety & Security Center and Collaboration Center opened - 2007
- New Cleanroom Laboratory opened
- 2008
- Shimizu Open Academy started
- 2010
- Main Building renewed as a Smart Building
- 2012
- Historical Gallery of Construction Technology renewed
- 2013
- Materials Laboratory and new Multipurpose Testing Laboratory opened
- 2015
- Advanced Earthquake Engineering Laboratory opened
- 2017
-
Robotics Laboratory opened
Aerial view of Institute of Technology (2017) - 2020
- Concrete DX Lab opened
- 2023
-
NOVARE Lab (Shimizu Institute of Technology Shiomi Lab) opened
NOVARE Lab(Shiomi Lab) (2023)